Skip to main content

Reports of the Committee of Members of Parliament from Madhya Pradesh on the review of the progress of rehabilitation of Projected - Affected Families due to Construction of Sardar Sarovar Dam, bulk: 14 September 1995, 2 November 1995

 File — Box: MS-027 Box 7, Folder: 4
Identifier: MS-027-1-2-7-4

Scope and Contents

Marked as Volume XXIX. Consists of the report of the members of parliament from Madhya Pradesh, translated into English, prefaced by a letter by Madhya Pradesh MP Dilip Singh Bhuriya to the (then) Chief Minister of Madhya Pradesh.

Dates

  • Creation: Majority of material found in 14 September 1995, 2 November 1995

Creator

Conditions Governing Access

Collection is open for access unless mentioned in specific folders of the finding aid.

Conditions Governing Use

Copyright may not have been assigned to Archives, National Centre for Biological Sciences. Permission for reproduction or distribution must be obtained in writing from the Archives at NCBS (archives@ncbs.res.in). The Archives at NCBS makes no representation that it is the copyright owner in all of its collections. The user must obtain all necessary rights and clearances before use of material and material may only be reproduced for academic and non-commercial use.

Full Extent

From the Collection: 15 Linear Feet (30 Hollinger style archive-boxes and 3 oversized items)

Language of Materials

From the Collection: English

Repository Details

Part of the Archives at NCBS Repository

Contact:
National Centre for Biological Sciences - Tata Institute of Fundamental Research
Bangalore Karnataka 560065 India
+9180 6717 6010
+9180 6717 6011